This method allows a comparison to be made between a Prescriptive ‘Deemed-to-Satisfy’ provision and a proposed Building Solution (including ‘Alternative Solutions). If the performance assessment determines that the proposed building solution complies in an ‘equivalent’ or it exceeds a Prescriptive ‘Deemed-to-Satisfy’ provision, then it can be deemed to meet the relevant Performance Requirement.